New Developments For Nsm design Water Supply System

New developments for nsm design water supply system diagram

By O. Oyedele Adeosun, Obafemi Awolowo University

INTRODUCTION

The following sub-sections provide brief descriptions of DEWA’s water supply system and the lead times required for commissioning water supply facilities. This includes details of demand categories and list of typical ranges of acceptable water demand rates. The final page provides a list of required documents that should accompany any. Chapter 7: Impacts of Fire Flow on Distribution System Water Quality, Design and Operation. A water supply system is analogous to the human circulatory system. The heart pumps blood through the arteries, veins, and capillaries to supply oxygen to all part of the body. A water pump supplies water. Yorkshire Water Mains Design and Construction Guidelines for Self Lay Providers January 2018 6 Water mains on new development sites should only be laid in the standard minimum 1.8m service strips identified by developers, not in the 0.6m service verges, when this is not possible, mains should be laid within the adopted highway.

All water supply systems use a combination of pipes (of different dimensions and materials), valves and outlets to deliver water to building users. Some water supply systems also use storage tanks and pumps. Designing a water supply system involves getting all of these elements right so that clean water is delivered to the user at the appropriate rate and temperature. Network Survey Manager (NSM) is a powerful tool in an Excel file, conceived to facilitate the management and data modification of water network, allowing quick transfer to/from Epanet, GIS, GPS or Google earth.It also helps to check the validity of the data and ease the correction, modification and renaming. Import data (.shp,.gpx,.inp).

Providing sufficient water of appropriate quality and quantity has been one of the most important issues in human history. Most ancient civilizations were initiated near water sources. As populations grew, the challenge to meet user demands also increased.

People began to transport water from other locations to their communities. For example, the Romans constructed aqueducts to deliver water from distant sources to their communities.

Today, a water supply system consists of infrastructure that collects, treats, stores, and distributes water between water sources and consumers. Limited new natural water sources, especially in the southwest region of the USA, and rapidly increasing population has led to the need for innovative methods to manage a water supply system. For example, reclaimed water has become an essential water resource for potable and nonpotable uses. Structural system additions including new conveyance systems and treatment and recharge facilities and operation decisions, such as allocating flow and implementing conservation practices, are made with the present and future demands in minds. As additional components and linkages between sources and users are developed, the complexity of the water supply system and the difficulty in understanding how the system will react to changes grows.

Many efforts on the development of a water supply system have been made through for sustainable water supply. However, the complexity of system limited the site specific application at the first era. As water demands pressures raise increasingly on the existing water supply system, many studies attempted to develop a general water supply system to assist decision makers to design more reliable systems for a long range operation period. These attempts also include the optimization of total system construction and operation cost. Under given situations such as pipeline maintenance, non-revenue water, advanced metering infrastructure, the ultimate goal of this paper is to ensure water distribution system challenges are overcome and supply water sources to users reliably in a more sustainable and timely manner as a long-term plan.

Water Distribution Systems

The purpose of distribution system is to deliver water to consumer with appropriate quality, quantity and pressure. Distribution system is used to describe collectively the facilities used to supply water from its source to the point of usage.

Requirements of Good Distribution System

  1. Water quality should not get deteriorated in the distribution pipes.
  2. It should be capable of supplying water at all the intended places with sufficient pressure head.
  3. It should be capable of supplying the requisite amount of water during firefighting.
  4. The layout should be such that no consumer would be without water supply, during the repair of any section of the system.
  5. All the distribution pipes should be preferably laid one metre away or above the sewer lines.
  6. It should be fairly water-tight as to keep losses due to leakage to the minimum.

New Developments For Nsm Design Water Supply System Diagram

Layouts of Distribution Network

The distribution pipes are generally laid below the road pavements, and as such their layouts generally follow the layouts of roads. There are, in general, four different types of pipe networks; any one of which either singly or in combinations, can be used for a particular place. They are: Grid, Ring, Radial and Dead End System.

Grid Iron System:

It is suitable for cities with rectangular layout, where the water mains and branches are laid in rectangles.

Advantages:

  1. Water is kept in good circulation due to the absence of dead ends.
  2. In the cases of a breakdown in some section, water is available from some other direction.

Disadvantages

  1. Exact calculation of sizes of pipes is not possible due to provision of valves on all branches.

Ring System:

The supply main is laid all along the peripheral roads and sub mains branch out from the mains. Thus, this system also follows the grid iron system with the flow pattern similar in character to that of dead end system. So, determination of the size of pipes is easy.

Advantages:

New developments for nsm design water supply system
  1. Water can be supplied to any point from at least two directions.

Radial System:

Wikipedia

The area is divided into different zones. The water is pumped into the distribution reservoir kept in the middle of each zone and the supply pipes are laid radially ending towards the periphery.

Advantages:

  1. It gives quick service.
  2. Calculation of pipe sizes is easy.

Dead End System:

It is suitable for old towns and cities having no definite pattern of roads.

Advantages:

  1. Relatively cheap.
  2. Determination of discharges and pressure easier due to less number of valves.

Disadvantages

  1. Due to many dead ends, stagnation of water occurs in pipes.

NON-WATER REVENUE

New developments for nsm design water supply system

Until the early 1990s, there were no reliable and standardized methods for accounting for water losses. Leakage management performance was measured in terms of “unaccounted-for water.” Since this term had no generally accepted definition, there was wide room for interpretation. Unaccounted-for water was typically expressed as a percentage of system input, which is already problematic.

Given this situation, utility performance could not be measured or compared, realistic targets could not be defined, and performance against targets could not be tracked reliably.

While this situation still exists in many countries, significant progress has been made to address these past shortcomings. Over the last 20 years, a number of organizations from around the world have developed a suite of tools and methodologies to help utilities evaluate and manage water losses in an effective manner.

One recommendation of the WLTF (Water Loss Task Force) was to use the term “non-revenue water” instead of “unaccounted-for water.” NRW (non-revenue water) has a precise and simple definition. It is the difference between the volume of water put into a water distribution system and the volume that is billed to customers. NRW comprises three components as follows:

Physical (or real): losses comprise leakage from all parts of the system and overflows at the utility’s reservoirs. They are caused by poor operations and maintenance, the lack of active leakage control, and poor quality of underground assets.

Commercial (or apparent): losses are caused by customer meter under registration, data handling errors, and theft of water in various forms.

Unbilled authorized consumption: includes water used by the utility for operational purposes, water used for firefighting, and water provided for free to certain consumer groups.

Although it is widely acknowledged that NRW levels in developing countries are often high, actual figures are elusive. Most water utilities do not have adequate monitoring systems for assessing water losses, and many countries lack national reporting systems that collect and consolidate information on water utility performance. The result is that data on NRW is usually not readily available. Even when data is available, it is not always reliable, as some poorly performing utilities are known to practice “window dressing” in an attempt to conceal the extent of their own inefficiency.

Lost water can be calculated as (A + L + R) [d] × flow rate [m3/d] = water lost [m3]

The volume of water lost from an individual pipe burst does not only depend on the flow rate of the event, but is also a function of run time. This is often overlooked. The leak run time consists of three components:

  • Awareness time: time until the utility becomes aware that there is a leak
  • Location time: time spent to precisely locate the leak so that a repair job order can be issued
  • Repair time: time between issuing of repair job order and completion of the repair

PIPELINE MAINTENANCE

Many water utilities in Asia practice passive leakage control, meaning that they repair only those leaks that are visible. This is clearly not enough since 90% of the leaks are usually not visible on the surface. This means it takes far too long, often many years, until the utility is even aware that there is a leak. Since awareness time largely determines the volume of water lost from a pipe burst, utilities need a strategy to reduce awareness time.

The most traditional and basic method is to have a team of leak detection specialists who check all pipes on a regular basis. Since leak noise can be detected, this work is done with a wide range of listening devices, ranging from simple mechanical listening sticks to electronic ground microphones or even leak noise correlators. Leakage inspectors use this equipment to listen to the network and identify problems, much like doctors use stethoscopes. If every part of the network is surveyed once a year, the average leak run time (awareness time) is 6 months. To reduce awareness time, the survey frequency can be increased. However, leak detection efforts will still not be well targeted. To be able to determine how much water is lost in specific parts of the network, the network must be split in hydraulically discrete zones and the inflow to these zones must then be measured. By computing the volume of leakage in each zone, leak detection specialists can better target their efforts. Clearly, the smaller the zone, the better the information and the efficiency of leak detection. The smallest zones are called District Metered Areas (DMAs). A DMA is hydraulically discrete and ideally has only a single inflow point. The inflow and corresponding pressure is measured and monitored on a continuous basis. Ideally, when the entire distribution network is split into DMAs, the utility has several advantages. For instance:

Nsm design
  • The volume of NRW (the difference between DMA inflow and billed volume) can be calculated on a monthly basis.
  • The components of NRW (physical and commercial losses) can be quantified by analysing flow and pressure data.
  • Leak detection works can be prioritized.
  • New pipe bursts can be identified immediately by monitoring the minimum night flow, and therefore awareness time will be reduced from several months to several days (or even less).
  • When leakage is eliminated, utilities can better gauge the existence of illegal connections or other forms of water theft and can take action.

Furthermore, DMAs (District Metered Area) can be helpful in managing pressure. At the inflow to the DMAs, pressure reducing valves can be installed, and the pressure in every DMA can be adjusted to the required level. There is no ideal size for a DMA. The size, whether it is 500 or 5,000 service connections, is always a tradeoff. The decision has to be made on a case-by-case basis and depends on a number of factors (e.g., hydraulic, topographic, practical and economic).

The size of DMAs has an impact on the cost of creating them. The smaller the DMA, the higher the cost. This is because more valves and flow meters will be required and maintenance is costlier. However, the benefits of smaller DMAs are that:

  • new leaks can be identified earlier, which will reduce awareness time;
  • location time can be reduced because it will be faster and easier to pinpoint the leak; and
  • as a byproduct, it is easier to identify illegal connections.

Topography and network layout also play an important role in DMA design and size. Therefore, there will always be DMAs of different sizes in a distribution network. An important influencing factor is the condition of the infrastructure. If mains and service connections are fragile, then bursts will be more frequent and the optimal DMA will be relatively small. On the other hand, in areas with brand new infrastructure, DMAs can be larger and still manageable.

According to the recommendations of the International Water Association’s (IWA) Water Loss Task Force, if a DMA is larger than 5,000 connections, it becomes difficult to discriminate small bursts (e.g., service connection bursts) from variations in customer night use. In networks with very poor infrastructure conditions, DMAs as small as 500 service connections might be warranted. A calibrated hydraulic model should always be used for DMA design irrespective of the size of the DMAs.

Water losses from larger diameter pipes can be quite significant, especially in the Asian context with predominantly low-pressure systems, where leaks will not come to the surface and remain unnoticed for many years. Leaks on large diameter pipes are always difficult to detect and often specialized equipment is required (e.g., inside pipe inspection and leak detection). These techniques are costly but might be economically well justified where water availability is limited and every cubic meter of water recovered can be sold to existing or new customers.

ADVANCED METERING INFRASTRUCTURE

Commercial losses are nearly always less in volume than physical losses, but this does not mean that commercial loss reduction is any less important. Commercial loss reduction has the shortest possible payback time, as any action immediately results in an increase in billed volume and an increase in revenues. Commercial losses consist of three main elements:

  • customer meter under-registration;
  • illegal connections and all other forms of water theft; and
  • problems and errors in metering, data handling, and billing.

Metering: Minimizing customer meter under-registration requires substantial technical expertise, managerial skills, and upfront funding. Customer meter management should be undertaken holistically, best described by the term “integrated meter management.”

In this effort, utilities should seek to select appropriate meter types and prepare tailored specifications. This can prove difficult, especially where procurement laws and regulations encourage purchasing the cheapest products on the market.

A number of meter manufacturers produce meters that “on paper” meet the specifications but deteriorate at an amazing rate in the field. This is one of the major obstacles for sustained improvement of customer meter accuracy. Contributing to this problem is the lack of good quality meter testing facilities, especially when it comes to larger diameter meters, and the lack of experience in how to best utilize such facilities. This makes it easy for manufacturers to supply meters from second class quality manufacturing batches with little risk that the utility would ever find out.

Another common problem is the reluctance to invest in high quality but more costly meters for large customers. Normally, the top accounts of a utility generate such a large portion of their revenues that any investment in more advanced meters can be economically justified. The payback time is often just a matter of months. Yet, many water utilities opt to maintain and calibrate old meters over and over again instead of taking appropriate action and installing new meters.

Billing system issues: The billing system is the only source of metered consumption data that can help determine the volume of NRW through an annual water audit. However, most billing systems are not designed to retain the integrity of consumption data. Rather, they are designed to deliver accurate bills to customers and correctly account for the bills. However, there are many day-to-day processes in operating a billing system that have the potential to corrupt the integrity of the consumption data, depending on the design of the particular system. Issues that can affect consumption volumes include

  • meter reading practices
  • handling of reversals of over-estimation
  • processes used for dealing with complaints about high bills
  • customer leaks
  • estimation of consumption
  • meter change-outs
  • tracking inactive accounts, and
  • the processes for the identification and rectification of stuck meters.

Water theft: While meter under-registration is more of a technical problem, water theft is a political and social issue. Reducing this part of commercial losses is neither technically difficult nor costly, but it requires making difficult and unpleasant managerial decisions that may be politically unpopular. The reason is that illegal connections are nearly always wrongly associated with only the urban poor and informal settlements. However, water theft by high-income households and commercial users, sometimes even large corporations, often accounts for sizable volumes of water lost and even higher losses of revenue.

In addition to illegal connections, other forms of water theft include meter tampering and meter bypasses, meter reader corruption, and illegal hydrant use. Another common problem is “inactive accounts.” In cases where a customer’s contract has been terminated, the physical service connection, or at least the tapping point on the main, still exists and is easy to re connect illegally. A stringent inactive account management and verification program can easily solve this problem.

CONCLUSION

Water distribution system should be based on a pipe layout that is suitable and have no or less water stagnation within the pipe to avoid tuberculation, encrustation and sediment deposits

Through a wealth of specialized publications and software development is now well understood that water distribution system management is technically difficult, but with current technologies, software systems, and highly specialized equipment (flushing and scraper), this is simply not the case anymore.

Water utilities will also need to practice appropriate design of system expansions/distribution (e.g., new network parts already constructed as DMAs) and use higher quality works, materials, and equipment. In addition, regulators and policy makers should require water utilities to do periodic water audits and regularly publish detailed water distribution system data, which can then be independently audited.

Again, water distribution system management should not be a one-time activity. Although an intense and comprehensive water distribution system reduction program is suitable to reduce the backlog of required water distribution system reduction measures, it should not lead to a sustainable low level of water distribution system unless water distribution system management becomes part of the normal day-to-day activities of the water utility.

Contact the author at dheyley@gmail.com.

Introduction to general design of domestic service water supply systems - with pressurized or gravity tanks

The purpose with a domestic service water supply system is to provide consumers with enough hot and cold water.

New Developments For Nsm Design Water Supply System Pdf

In old buildings it is common with gravity storage tanks on the top floor of the building. More commonly used in new systems are pressurized tanks and supply pumps.

Domestic Water Supply with Gravity Tank

Domestic water supply system with gravity tank:

For proper operation of the system the gravity tank is located at least 30 ft or 10 m above the highest outlet or consumer. In taller buildings pressure reducing valves are required in the lowest floors before the fittings.

The volume of a gravity tank must be designed to compensate for limited capacity of a supply line. The tank fills up when the consumption of hot and cold water is lower than the capacity of the supply line - and the tank is emptied when the consumption is higher than the capacity of the supply line.

A drawback with the open gravity tank on the top floor is the potential danger of freezing during winter conditions. Huge tanks will also influence on the construction of the building.

Domestic Water Supply with a Pressurized Tank

Domestic water supply system with pressurized tank:

The pressurized tank is partly filled with air (or gas) behind a membrane. The air compensates for pressure variations during consumption and when supply pump starts and stops.

A pressurized tank has a limited compensating capacity for the shortage in a main supply line.

New Developments For Nsm Design Water Supply Systems

Estimating Required Buffer Tank Capacity

New Developments For Nsm Design Water Supply System Wikipedia

You are free to use the template bellow as a tool to estimate required buffer capacity in a water supply system. Log in to your Google Account to make your own copy to modify of the template. Alternatively - you can also save the Google Spreadsheet to your computer as a xls file.

Related Topics

  • Water Systems - Hot and cold water service systems - design properties, capacities, sizing and more

Related Documents

  • Cold Water Storage Capacity - Required cold water storage capacity - commonly used fixtures and types of buildings
  • Cold Water Storage per Occupant - Cold water storage for occupants in common types of buildings as factories, hospitals, houses and more
  • Cross-Contamination Control - It is fundamental to keep the potable water in the water supply systems uncontaminated
  • Domestic Hot Water Service Systems - Design Procedure - Design procedure for domestic hot water service systems
  • Domestic Water Supply - Lime Deposits - Lime deposited vs. temperature and water consumption
  • Hot and Cold Water Pipe Sizing - Recommended dimensions of hot and cold water pipes
  • Hot Water Circulation Return Pipe - Hot water can be circulated through a return pipe if it's instantly required at the fixtures
  • Hot Water Supply - Fixture Consumption - Design hot water consumption of fixtures - basins, showers, sinks and baths
  • Legionella - Legionella pneumophila - bacterium that thrives in water supply systems and air conditioning systems - causing the Legionnairs disease
  • Online Design of Water Supply Systems - Online design tool for a water supply system
  • PE Water Supply Pipes - Properties - Nominal pipe size, outside diameter, wall thickness, weight and working pressure
  • Sizing Domestic Hot Water Heaters - Domestic Hot-Water sizing equations - heating capacity, recovery rate and power supply
  • Water - Human Activity and Consumption - Activity and average water consumption
  • Water Distribution Pipes - Materials used in water distribution pipes
  • Water Service Pipe Lines - Water service pipe lines extends from the potable water source to the interior of buildings
  • Water Supply Pipe Lines - Sizing - Sizing of water supply pipe lines
  • Water Supply to Public Buildings - Required water supply to public buildings
  • Yard Fixtures - Water Consumption - Water consumption in garden fixtures

Tag Search

  • en: service water supply domestic gravity pressure tank